The drilling operation should not cause ground vibrations, but there will be noise and traffic impacts around the work area. Portions of the work require 24-hour operations with construction lights on-site.
Show All Answers
Drilling and testing a deep well takes about two months. Outfitting the well is an additional 6- to 9-months of on-site construction.
The drilling equipment takes up an area of about 200-ft x 100-ft.
Yes, the work site will be within a construction fence.
The City can apply for grants and or low interest loans from the state.